Buford Dam Water Release Schedule Today
Is Buford Dam releasing water today?
Yes — Buford Dam is releasing water today at a minimum-flow rate of 606 cfs as of 4:00 PM ET (USGS 02334430), which is below the ~1,000 cfs hydropower-generation threshold, so generation appears idle. For the official 24-hour generation/release schedule call (770) 945-1466 or check the USACE Buford Project page — this page does not invent clock times.
Downstream safety: water rises quickly below Buford Dam when hydropower generation starts. Check the live release/generation reading and the official USACE forecast before wading or fishing the Chattahoochee tailwater.
Buford Dam release & generation schedule
Live discharge comes from USGS gauge 02334430. This site does not invent generation clock times — call (770) 945-1466 or open the USACE Buford Project page for the official 24-hour generation forecast. Releases control the upstream Lake Lanier water level.
Frequently asked questions
Is Buford Dam releasing water today?
Yes. Buford Dam is on a minimum-flow release of 606 cfs as of 4:00 PM ET (USGS 02334430). That is below the ~1,000 cfs generation threshold, so generation appears idle. Call (770) 945-1466 for the official 24-hour generation schedule.
What is the Buford Dam generation schedule?
Generation is scheduled day-to-day by the U.S. Army Corps of Engineers based on power demand, lake elevation versus target, and downstream flow needs. Typical weekday peak windows are roughly 6–10 AM and 4–9 PM. The official next-24-hour generation forecast is on the USACE Mobile District hotline at (770) 945-1466 and the USACE Buford Project page — this site shows measured discharge, not invented clock times.
Is it safe below Buford Dam when generation starts?
Water rises quickly in the Chattahoochee tailwater when hydropower generation starts. Check the live release/generation status and the USACE forecast before wading or fishing below the dam, and leave the riverbed immediately if sirens sound or flow increases.